This company had already made several models with Chinese manufacturers and needed to develop a more unique and complex design. Timelines were very tight and the client wanted to minimize the risks of IP leakage.

- Examples of design improvements we provided: quality improvements on plating (on aluminum casting), improved assembly process for fewer defects and higher efficiency.
- Time from design to functional prototype: 4 months
- Applicable certifications for selling in the USA: UL, FCC, FDA
- Tooling necessary for mass production: testing jigs (functional, dimensional, HASS…)
- Critical components: lithium polymer battery, cast metal alloy and PVD plating, PCBA and battery management system, borosilicate glass, heating ceramic
- Minimum order quantity in each color: between 50 and 10,000 pcs
- Number of assembly workstations: 35
- Highest sources of risks in assembly: what cannot easily be tested or verified (e.g. pinched wires when closing the casing)